CX-019051: Design, Installation, and Operation of New Remediation Well (RWM-19) for Treatment at the M-1 Air Stripper

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

September 26, 2018
minute read time

The activity includes designing, installing, and operating a new remediation well, similar to the existing remediation well RWM-18, that pumps groundwater to the M-1 Air Stripper (M-Area) for treatment. Design of RWM-19 is projected to start in October 2018.  Installation is projected to start in December 2018.  Operation is expected to start in 2020.  The appropriate site and regulatory approvals will be obtained prior to installation and operation.