Categorical Exclusion Determination
Office of NEPA Policy and Compliance
September 27, 2018Site Visit and Evaluation; Conceptual Design; ALB Detailed Engineering and Construction; MGN Detailed Engineering and Construction; and PGH Detailed Engineering and Construction.
CX-018827.PDF
(179.75 KB)