Categorical Exclusion Determination
Office of NEPA Policy and Compliance
July 23, 2018Western Area Power Administration proposes to conduct routine maintenance to raise the height of structures 1/2, 1/3, 13/1, and 13/2 on the Thermopolis-Boysen 115-kilovolt Transmission Line.
CX-018804.pdf
(232.92 KB)