Bonneville Power Administration propose to replace the Bonneville Captive Brood facility’s aging roof. The facility was constructed in the mid-1990s near the Bonneville Hatchery and was fully funded by Bonneville Power Administration. Bonneville Power Administration owns the facility and all associated fish rearing equipment and continues to fund the maintenance of the facility even when fish are not being reared.