Categorical Exclusion Determination
Office of NEPA Policy and Compliance
July 31, 2018The subcontractor shall provide all materials, labor, supervision, equipment, and transportation required to replace and install Bryan Mound Pump 270. This project includes but is not limited to providing all pipe, valves, pipefittings and flanges associated with the replacement pump.