CX-018671: Replace Air Conditioning Units for Control Room in Building 301 - WH

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

August 27, 2018
minute read time

The contractor shall provide all material, tools, hardware, software, electronics, mechanical and electrical devices, consumables, equipment, supplies, transportation, facilities, labor, supervision and engineering support to replace two 10 ton Liebert Heating, Ventilation, and Cooling constant temperature split system units with two constant temperature split system units of the same voltage and capacity.

CX-018671.pdf (137.9 KB)