Categorical Exclusion Determination
Office of NEPA Policy and Compliance
July 7, 2017Relocate the existing power line so that lower 56-7 will no longer be in a slough.
CX-018609.pdf
(434.73 KB)
Categorical Exclusion Determination
Office of NEPA Policy and Compliance
July 7, 2017Relocate the existing power line so that lower 56-7 will no longer be in a slough.