CX-018542: Portland General Electric Conductor Installation

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

August 9, 2018
minute read time

Bonneville Power Administration is proposing to allow Portland General Electric to install a new 115-kilovolt overhead conductor on its Keeler-Allston Number 1 fee-owned right-of-way in Washington County, Oregon. The conductor would span the width of the right-of-way and would entail one new wood pole installation. No additional ground disturbance is proposed.

CX-018542.pdf (365.55 KB)