Categorical Exclusion Determination
Office of NEPA Policy and Compliance
June 11, 2018The scope of the Kesselring Site Building 19 Heating, Ventilation and Air Conditioning project consists of replacing the existing Heating, Ventilation and Air Conditioning systems and controls serving the north and west ends of the first floor and the second floor with one new floor mounted Air Handing Unit, located in a Mechanical Room inside the building, and one air cooled condensing unit located on an exterior concrete pad to the north of the building.