Categorical Exclusion Determination
Office of NEPA Policy and Compliance
May 30, 2018Western Area Power Administration proposes to repair damaged cross arms and hardware on existing structures along the Sonora-San Luis 34.5 kilovolt Transmission Line during Summer 2018.
CX-018254.pdf
(76.18 KB)