Categorical Exclusion Determination
Office of NEPA Policy and Compliance
May 7, 2018The purpose of this revision is to update project scope to correct the location of the trench for fiber optic cable and power. The buried conduit will not be located within the graveled area mentioned in the original electrical conduit, but will be placed about 6-10 feet. east of the graveled edge of the road and ditch. The conduit will then be direct buried from B21-608 (not B8-601 as stated in the original electrical conduit) through a series of handholes to the southeast corner of range 6.