Categorical Exclusion Determination
Office of NEPA Policy and Compliance
April 20, 2018Bonneville Power Administration proposes to perform routine road maintenance, repair and improvements on 15,840 linear feet for the Captain Jack-Olinda Number 1 transmission line from structure 1/1 to 7/4. The proposed work is necessary to maintain or repair existing infrastructure and roadway safety.