CX-017965: Covington-White River Insulator Replacement

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

May 17, 2018
minute read time

Bonneville Power Administration proposes to replace insulators on towers 6/2 and 6/3 of the Covington-White River Numbers 1 and 2 double-circuit 230 kilovolt lines.

CX-017965.pdf (316.36 KB)