CX-017894: Engineering, Testing, and Design of a Commercial-Scale Post-Combustion Carbon Dioxide Capture System on an Existing Coal-Fired Generating Unit

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

April 17, 2018
minute read time

Design and determine the cost of installing carbon dioxide capture at an existing coal-fired boiler, Minnkota's Milton R. Young Station Unit 2. Estimates supplemented from pilot plant operation.