Categorical Exclusion Determination
Office of NEPA Policy and Compliance
April 17, 2018Design and determine the cost of installing carbon dioxide capture at an existing coal-fired boiler, Minnkota's Milton R. Young Station Unit 2. Estimates supplemented from pilot plant operation.