Categorical Exclusion Determination
Office of NEPA Policy and Compliance
April 20, 2018Provide a detailed design and cost estimate for a commercial scale carbon dioxide capture facility retrofitted onto an existing coal-fueled power station.
Categorical Exclusion Determination
Office of NEPA Policy and Compliance
April 20, 2018Provide a detailed design and cost estimate for a commercial scale carbon dioxide capture facility retrofitted onto an existing coal-fueled power station.