Categorical Exclusion Determination
Office of NEPA Policy and Compliance
April 4, 2018Bonneville Power Administration is proposing to repair 3.5 miles and construct approximately 0.25 mile of access roads along two transmission lines within Bonneville Power Administration’s Bell District, one in northern Idaho and one in northeastern Washington. The access road work would be for the following transmission lines: Lancaster – Noxon Number 1 and Boundary – Nelway.