CX-017822: Sprint’s Carson Communications Equipment Upgrade Project

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

April 10, 2018
minute read time

Bonneville Power Administration proposes to allow Sprint to upgrade their existing wireless equipment located on structure 10/1 of Bonneville Power Administration’s North Bonneville-Midway #1 transmission line near Carson, Washington. Sprint proposes to remove six antennas currently mounted at the top of the 90-foot-tall Bonneville Power Administration structure, and replace them with six new antennas of similar appearance and size. 