CX-017131: 2017-059 Flaming Gorge Vernal No. 3 138- Kilovolts Transmission Line Relocation of Structures 20 5 through 21 5 Uintah County, Utah

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

June 29, 2017
minute read time

Western Area Power Administration (WAPA) proposes to repair Structure 18/4 of the North Gunnison - Salida 115 kilovolt Transmission Line.

CX-017131.pdf (445.99 KB)