CX-015578: Categorical Exclusion Determination

NW Natural Pipeline Installation CX(s) Applied: B4.9Date: 08/09/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

August 9, 2016
minute read time

NW Natural Pipeline Installation
CX(s) Applied: B4.9
Date: 08/09/2016
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) is proposing to allow NW Natural to install pipeline within BPA transmission line right-of-way (ROW).

Document(s) Available for Download