Remove IT Equipment from Research Ridge Building 3 CX(s) Applied: B1.7Date: 41879 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
August 28, 2014Remove IT Equipment from Research Ridge Building 3
CX(s) Applied: B1.7
Date: 41879
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory
Disconnect and remove copper and fiber cabling and associated cable cross connects and patch cabling from RR3 back to the T-40 pedestal.
CX(s) Applied: B1.7
Date: 41879
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory
Disconnect and remove copper and fiber cabling and associated cable cross connects and patch cabling from RR3 back to the T-40 pedestal.