Building 26 Air Handlers and In-Line Return Fans Replacement CX(s) Applied: B1.3, B1.22, B.1.31 Date: 04/25/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
April 25, 2013
minute read time
Building 26 Air Handlers and In-Line Return Fans Replacement
CX(s) Applied: B1.3, B1.22, B.1.31
Date: 04/25/2013
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory
Removal and replacement of four air-handling units, four in-line return fans, and all ancillary equipment and the installation of variable frequency drives on two new chilled water pumps.
CX(s) Applied: B1.3, B1.22, B.1.31
Date: 04/25/2013
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory
Removal and replacement of four air-handling units, four in-line return fans, and all ancillary equipment and the installation of variable frequency drives on two new chilled water pumps.