McNary-Horse Heaven 230-kilovolt Transmission Line Raise (Structures 15/2 to 16/3) CX(s) Applied: B1.3 Date: 12/01/2011 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
December 1, 2011McNary-Horse Heaven 230-kilovolt Transmission Line Raise (Structures 15/2 to 16/3)
CX(s) Applied: B1.3
Date: 12/01/2011
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to add six wooden prop structures to the McNary-Horse Heaven No. 1 230-kilovolt transmission line between structures 15/2-16/3. The prop structures are needed to raise the existing line so that the conductor meets the necessary Minimum Approach Distance from the orchard below. An augur truck would use existing BPA roads to access the site and install wooden poles.
CX(s) Applied: B1.3
Date: 12/01/2011
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to add six wooden prop structures to the McNary-Horse Heaven No. 1 230-kilovolt transmission line between structures 15/2-16/3. The prop structures are needed to raise the existing line so that the conductor meets the necessary Minimum Approach Distance from the orchard below. An augur truck would use existing BPA roads to access the site and install wooden poles.