CX-000502: Categorical Exclusion Determination

Tree Removal and Chipping at P-Area Ash Basin and R-Area Ash Basin and P-007 OutfallCX(s) Applied: B6.1Date: 07/16/2009Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office

Office of NEPA Policy and Compliance

July 16, 2009
minute read time

Tree Removal and Chipping at P-Area Ash Basin and R-Area Ash Basin and P-007 Outfall
CX(s) Applied: B6.1
Date: 07/16/2009
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office

Remove all trees and vegetation within the clearing limits of the P-Area Ash Basin (including the P-007 Outfall) and the R-Area Ash Basin. The trees and vegetation at the two ash basins will be chipped and transferred to the A-Area Powerhouse. The trees and vegetation at the P-007 Outfall will remain inside the P-007 Outfall area.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD

CX-000502.pdf (552.46 KB)