Dismantling, Removal and Decommissioning of Contaminated Ducting and Associated Equipment in the Plutonium Facility Fan Loft and Basement of Building 350 (New Brunswick Laboratory)CX(s) Applied: B1.17, B1.16, B1.3, B6.1, B2.5Date: 12/10/2009Location(s)...
Office of NEPA Policy and Compliance
December 10, 2009Dismantling, Removal and Decommissioning of Contaminated Ducting and Associated Equipment in the Plutonium Facility Fan Loft and Basement of Building 350 (New Brunswick Laboratory)
CX(s) Applied: B1.17, B1.16, B1.3, B6.1, B2.5
Date: 12/10/2009
Location(s): Illinois
Office(s): Science, New Brunswick Laboratory
The Department of Energy New Brunswick Laboratory requires the services of a Dismantling, Removal and Decommissioning contractor to dismantle and remove radiological contaminated ventilation and other mechanical equipment from the basement and fan loft areas of the Building 350 Plutonium Facility.