Tank Waste

An aerial view of the Salt Waste Processing Facility at the Savannah River Site.
EM’s Salt Waste Processing Facility (SWPF) has successfully processed more than 1 million gallons of radioactive waste at Savannah River Site (SRS) since the first-of-a-kind facility began processing the legacy material in October 2020.
The Hanford Site took an important step closer to treating tank waste, as tank operations contractor Washington River Protection Solutions workers install a pump into an underground waste storage tank.
EM’s Office of River Protection and its tank operations contractor Washington River Protections Solutions are an important step closer to treating tank waste at the Hanford Site after the recent installation of two critical pumps.