Safety News

A robotic arm, deployed by EM contractor Washington River Protection Solutions workers, sands, repaints and applies a fresh waterproof coating to repair a valve pit’s torn liner at the Hanford Site.
A robotic arm, deployed by EM contractor Washington River Protection Solutions workers, sands, repaints and applies a fresh waterproof coating to repair a valve pit’s torn liner at the Hanford Site.
Newport News Nuclear BWXT-Los Alamos Waste Retrieval Operations Supervisor Juan Garcia guides a mock-up pipe, filled with cement that does not contain radioactive waste, while it is loaded onto a pipe-roller conveyor belt before being cut into sections.
The EM Los Alamos Field Office (EM-LA) recently installed a hydraulic shear system, a major step toward remediating transuranic (TRU) waste contained in large, corrugated metal pipes buried underground at Los Alamos National Laboratory (LANL) since 1986.