EM Newsletters

A robotic arm, deployed by EM contractor Washington River Protection Solutions workers, sands, repaints and applies a fresh waterproof coating to repair a valve pit’s torn liner at the Hanford Site.
A robotic arm, deployed by EM contractor Washington River Protection Solutions workers, sands, repaints and applies a fresh waterproof coating to repair a valve pit’s torn liner at the Hanford Site.
Hanford Crews Qualified for Melter Heatup
Four of five crews of operations staff, including Commissioning Technician Gwendy Watkins, pictured here, at the Hanford Waste Treatment and Immobilization Plant are now fully qualified in their “watch stations”.
Newport News Nuclear BWXT-Los Alamos Waste Retrieval Operations Supervisor Juan Garcia guides a mock-up pipe, filled with cement that does not contain radioactive waste, while it is loaded onto a pipe-roller conveyor belt before being cut into sections.
The EM Los Alamos Field Office (EM-LA) recently installed a hydraulic shear system, a major step toward remediating transuranic (TRU) waste contained in large, corrugated metal pipes buried underground at Los Alamos National Laboratory (LANL) since 1986.