EM Newsletters

Workers with tank operations contractor Washington River Protection Solutions connect hoses to an ion exchange column inside the Tank-Side Cesium Removal System’s process enclosure before processing another batch of tank waste at the Hanford Site.
EM Office of River Protection (ORP) tank operations contractor Washington River Protection Solutions (WRPS) recently resumed processing high-level tank waste through the Tank-Side Cesium Removal System at the Hanford Site following a maintenance outage.