Office of Secure Transportation Multiple Actions CX(s) Applied: B1.2, B1.3, B1.11, B1.15 Date: 09/25/2013 Location(s): Tennessee Offices(s): Oak Ridge Office
Office of NEPA Policy and Compliance
September 25, 2013Office of Secure Transportation Multiple Actions
CX(s) Applied: B1.2, B1.3, B1.11, B1.15
Date: 09/25/2013
Location(s): Tennessee
Offices(s): Oak Ridge Office
The NNSA's Office of Secure Transportation (OST) proposes the following actions: 1) install a new fire water protection supply piping system at the Secure Transportation Complex (STC) to the Vehicle Maintenance Facility (VMF) and conduct a radar survey of the concrete parking apron along the 8-inch ductile iron pipe path to look for sink holes, 2) increase the concrete firing line at the OST from 2,250 square feet to 6,250 square feet, 3) expand the training acreage of OST's User Permit by 600 acres, 4) install a security boundary fence at OST, and 5) create a new gravel parking lot area.