The Ensuring Energy Reliability for Rural Futures project would involve installation of Fault Indicator (FI) equipment on existing infrastructure i…
Office of NEPA Policy and Compliance
September 6, 2024The Ensuring Energy Reliability for Rural Futures project would involve installation of Fault Indicator (FI) equipment on existing infrastructure in the Sioux Valley Energy (SVE) electrical distribution system.