Revision 0: With the evolving construction of the Surplus Plutonium Disposition (SPD) Project an existing Quonset hut (763-111N) will be removed, a…
Office of NEPA Policy and Compliance
July 30, 2024Revision 0: With the evolving construction of the Surplus Plutonium Disposition (SPD) Project an existing Quonset hut (763-111N) will be removed, and a new fabric tension structure (Quonset hut) will be installed in N Area. The enlarged Quonset hut is needed to meet the warehouse and inventory demands.