CX-031940: South Substation Resiliency Project

Maquoketa plans to underground a new line connected to the existing circuit and to increase the conductor size of the South Main Street Circuit Ris…

Office of NEPA Policy and Compliance

August 21, 2024
minute read time

Maquoketa plans to underground a new line connected to the existing circuit and to increase the conductor size of the South Main Street Circuit Riser.