(1)replace distribution and transmission structures with higher wind rated poles to meet wind load criteria, (2)install an energy storage/delivery …
Office of NEPA Policy and Compliance
June 24, 2024(1)replace distribution and transmission structures with higher wind rated poles to meet wind load criteria, (2)install an energy storage/delivery system (Battery storage) to a substation.