Replace the electrically failed DESC station 15-1 (151-1C) 115/13.8 kV transformer with a new unit. DESC, responsible for O and M of the transforme…
Office of NEPA Policy and Compliance
June 27, 2024Replace the electrically failed DESC station 15-1 (151-1C) 115/13.8 kV transformer with a new unit. DESC, responsible for O and M of the transformer by their DOE contract, will drain the oil to be dispositioned off-site by their qualified subcontractor.