Feedstock reserve drilling and testing, lab-scale production to optimize CM recovery, engineering design of potential future plant with cost estima…
Office of NEPA Policy and Compliance
April 25, 2024Feedstock reserve drilling and testing, lab-scale production to optimize CM recovery, engineering design of potential future plant with cost estimate, environmental studies (no EIS or EA).