Bonneville Power Administration (BPA) proposes to replace disconnect switches at structures 9/4, 9/7, and 11/2 and to reconfigure transmission stru…
Office of NEPA Policy and Compliance
April 29, 2024Bonneville Power Administration (BPA) proposes to replace disconnect switches at structures 9/4, 9/7, and 11/2 and to reconfigure transmission structures 9/4 to 9/8 and structure 11/2 on the 115-kilovolt (kV) Bell-Addy No. 1 transmission line in Spokane County, Washington.