Repair and coat the chemical containment dikes in 782-3A. Revision 1 is necessary to include the rerouting of power and signal cables for the scope…
Office of NEPA Policy and Compliance
November 1, 2023Repair and coat the chemical containment dikes in 782-3A. Revision 1 is necessary to include the rerouting of power and signal cables for the scope of work.