Bonneville Power Administration (Bonneville) proposes to allow applicant to remove up to two overhead lines and install up to two new underground l…
Office of NEPA Policy and Compliance
August 30, 2023Bonneville Power Administration (Bonneville) proposes to allow applicant to remove up to two overhead lines and install up to two new underground lines in 4 in. conduit at a depth of 3-6 feet.