Bonneville Power Administration (BPA) proposes to modify its 115-kilovolt (kV) Benton-Franklin No. 1 and No. 2 transmission lines between structure…
Office of NEPA Policy and Compliance
July 7, 2023Bonneville Power Administration (BPA) proposes to modify its 115-kilovolt (kV) Benton-Franklin No. 1 and No. 2 transmission lines between structures 13/1 and 13/3 in Franklin County, Washington.