This scope covered the ground preparation, creation, construction, and installation of the sign (See Figure 2 and 3 for approximate location). It a…
Office of NEPA Policy and Compliance
April 10, 2023This scope covered the ground preparation, creation, construction, and installation of the sign (See Figure 2 and 3 for approximate location). It also includes the required solar panels, battery box, conduit, and wiring to operate lights for night viewing (see Figure 4).