CX-027886: Collect geotechnical borings, drill a hole into the ground

The proposed action includes two phases. In Phase I, we will collect a geotechnical boring. This involves a specialized drill rig that drills a hol…

Office of NEPA Policy and Compliance

March 14, 2023
minute read time

The proposed action includes two phases. In Phase I, we will collect a geotechnical boring. This involves a specialized drill rig that drills a hole into the ground and extracts a column of material. In Phase II, we will drill a hole in the ground and collect data during the process.