CX-027455: Montrose-Hesperus 345-kV and Curecanti-Lost Canyon 230-kV Transmission Lines: Access Road and Transmission Line Right-of-Way Maintenance

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (…

Office of NEPA Policy and Compliance

January 4, 2023
minute read time

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (ROW) maintenance between Structures 194 and 412 on the Montrose-Hesperus (MTR-HS) 345-kV Transmission Line in Dolores, Montezuma, and La Plata counties, Colorado, and between parallel Structures 59/5 to 78/4 on the Curecanti-Lost Canyon (CCI-LCN) 230-kV Transmission Line in Dolores and Montezuma counties, Colorado.