CX-027379: Remove Circuits in 704-1N Telefacility

Construction will Demolition and Disposition Uninterruptible Power Supply (UPS), conduit and wiring connected to the following panels: breaker pane…

Office of NEPA Policy and Compliance

December 8, 2022
minute read time

Construction will Demolition and Disposition Uninterruptible Power Supply (UPS), conduit and wiring connected to the following panels: breaker panel RP1, network system distribution, battery cabinet, UPS rotary by-pass switch, and UPS station in building 704-1N.