The scope of the project is proposed to alter the existing upper CSR area with minor regrading to place gravel for the parking area and ingress-egress driving aisles.
Office of NEPA Policy and Compliance
September 30, 2022The scope of the project is proposed to alter the existing upper CSR area with minor regrading to place gravel for the parking area and ingress-egress driving aisles.