CX-026661: Martin Creek-Drain No.1 Urgent Pole Replacement of Structures 9/5 and 11/6

Bonneville Power Administration (BPA) proposes to replace the wood pole structures located at 9/5 and 11/6 on the Martin Creek-Drain No.1 transmission line. During inspection, these two structures were found to have substantial defects that could result in risk to human safety and system reliability, and must be replaced.

Office of NEPA Policy and Compliance

August 17, 2022
minute read time

Bonneville Power Administration (BPA) proposes to replace the wood pole structures located at 9/5 and 11/6 on the Martin Creek-Drain No.1 transmission line. During inspection, these two structures were found to have substantial defects that could result in risk to human safety and system reliability, and must be replaced.