Bonneville Power Administration (BPA) proposes to replace insulators on two structures located at 17/4 of the 500 kV Grizzly – Captain Jack No. 1 a…
Office of NEPA Policy and Compliance
August 5, 2022Bonneville Power Administration (BPA) proposes to replace insulators on two structures located at 17/4 of the 500 kV Grizzly – Captain Jack No. 1 and Grizzly – Summer Lake No. 1 high-voltage transmission lines in central Oregon.