Two vessels (TK 7.5 and TK 17.3) will need to be configured with a new SpG transmitter and a new liquid level-SpG jumper.…
Office of NEPA Policy and Compliance
June 30, 2022Two vessels (TK 7.5 and TK 17.3) will need to be configured with a new SpG transmitter and a new liquid level-SpG jumper.