The objective of the project is to perform a Phase II Pre-FEED study on the integration of a 10-MWh-e sand-based thermal energy storage (SandTES) s…
Office of NEPA Policy and Compliance
April 21, 2022The objective of the project is to perform a Phase II Pre-FEED study on the integration of a 10-MWh-e sand-based thermal energy storage (SandTES) system to Southern’s coal-fired Plant Gaston.