Subcontractor will provide a roof replacement at 730-B. The Subcontractor “will“ disturb the existing roof while performing this roof replacement o…
Office of NEPA Policy and Compliance
April 29, 2022Subcontractor will provide a roof replacement at 730-B. The Subcontractor “will“ disturb the existing roof while performing this roof replacement on 730-B.