CX-270667: Naval Reactors Facility Backup Power Upgrade Project

The scope of the project includes modifying the current electrical system to manage the electrical loads more efficiently.

Office of NEPA Policy and Compliance

March 10, 2022
minute read time

The scope of the project includes modifying the current electrical system to manage the electrical loads more efficiently.

CX-270667.pdf (1.16 MB)